![Drilling face holes](http://ashfords.me.uk/wp-content/uploads/2015/10/DSC04163-150x150.jpg)
![... and edges](http://ashfords.me.uk/wp-content/uploads/2015/10/DSC04167-150x150.jpg)
![](http://ashfords.me.uk/wp-content/uploads/2015/10/DSC04172-150x150.jpg)
A few photos of construction details.
Apart from those anchoring the V-frames to the sides, screws were used only in hidden areas, namely the filler behind the front flap and the lower V-frame joint with the bottom.
![Drilling dowels on the spacer](http://ashfords.me.uk/wp-content/uploads/2015/10/DSC04169-150x150.jpg)
Drilling dowels for the upper V-frame mitre joint.
![V-frame in position](http://ashfords.me.uk/wp-content/uploads/2015/10/DSC04173-150x150.jpg)
![Lower V-frame joint detail](http://ashfords.me.uk/wp-content/uploads/2015/10/DSC04175-150x150.jpg)
Setting out V-frame and bottom mitre joint. I drilled a 5-dowel joint between upper and lower V-frame elements.
![Second side dry fit](http://ashfords.me.uk/wp-content/uploads/2015/10/DSC04177-150x150.jpg)
![Marking side dowels](http://ashfords.me.uk/wp-content/uploads/2015/10/DSC04176-e1444658005932-150x150.jpg)
Fitting “top” side before marking out V-frame dowel positions.
![Final dowel mark-up](http://ashfords.me.uk/wp-content/uploads/2015/10/DSC04179-e1444657735419-150x150.jpg)
![Perfect fit!](http://ashfords.me.uk/wp-content/uploads/2015/10/DSC04178-150x150.jpg)
Squaring across marks and centring at 9mm.